Soo Line - Ashland Division

Railroad Tracks Navigation BarLink to MINN-RAIL Schedule PageLink to MINN-RAIL Layouts PageLink to MINN-RAIL Hotel PageLink to MINN-RAIL Restaurants PageLink to MINN-RAIL Hobby Shops PageLink to MINN-RAIL Links PageLink to MINN-RAIL Registration PageLink to MINN-RAIL FAQ PageLink to MINN-RAIL Contacts PageLink to MINN-RAIL Home PageLink to MINN-RAIL Information Page

The Soo Line Ashland Division is an HO scale basement size layout representing the Soo Line Ashland subdivision and Ironwood subdivision in 1965. The layout is point to point with staging yards at each end of the Ironwood sub, plus another staging yard representing the end of the Ashland sub.

Control is with a Lenz DCC system with Lenz plug in throttles and Easy DCC wireless throttles. The layout is operated with car cards and waybills, and dispatched using a timetable and train orders.

Operations center around Ashland, Wisconsin where there are 2 yard jobs on duty daily, one switching the freight yard and one switching the ore and ore dock. There are several through freights and locals that run daily.

The main line leaves Ashland heading east, and passes through the town of Marengo, where a sawmill is located and then to the town of Mellen. At Mellen there is a junction, with the Ashland subdivision continuing southeast towards Stevens Point and Chicago, and the Ironwood subdivision continuing east to Ironwood and Bessemer, Michigan, and eventually to Marquette, Michigan. On the Ironwood subdivision the towns of Upson, Iron Belt, Hoyt and Hurley are passed before arriving in the yard at Ironwood. The logging and mining industries keep the local freight busy, and at Gogebic Range mines load many cars of ore for the dock at Ashland.

At Ironwood the through freights drop off and pick up cars for the local industries. Ore loads are gathered at Bessemer yard and assembled into trains for Ashland. Through freights will continue east from Ironwood to a connection to the old DSS&A main line to Marquette and Sault Ste Marie Michigan.

Superintendent Russ Nyquist
Division or Location: Soo Line, Ashland and Ironwood subdivisions
Interchange Railroads: NP, C&NW
Size of Railroad: Approximately 750 sq. ft.
Scale: HO
Era: 1965
Control System: Lenz DCC with Lenz and Easy DCC wireless throttles
Scale Clock Speed: 4:1
Length of Session: 3-4 hours
Number of Crew: 8-9
Train Control: Timetable and train orders.
Are Radios Required: No. Operators used fixed location telephones to communicate to dispatcher.
Listed Jobs: 3 yard jobs, industry switch jobs, several road jobs, plus dispatcher
Accessibility: Stairs to basement. Swing gate entry to layout room.
Distance from hotel: 21 miles
Estimated travel time from hotel: 25 minutes
Web Site: {None...yet}
Pets: None

Layout Photos (click to enlarge):

 
 
 
 
 
 
 
 
Layout Schematic
 

Return to Layouts Page

Information

Cute Railroad Page Divider

Note: The Click on the following link and leave the MINN-RAIL site means that the link following will take you off the MINN-RAIL website. We have no control over the content of these sites, but believe they will be of interest.   
Send email to the webmaster with questions or comments about this web site.

Site originally designed by PJWebWorx.
Copyright © 2002, 2003, 2004, 2007 by MINN-RAIL.