|
|
|
The layout is designed to give a real sense of railroading on the Missabe in the 1950s by following
the principles of the real DM&IR Railway as it operated in the 1950s.
Click this link to see the Layout Intro Flyer in PDF format. (Adobe Acrobat Reader or equivalent required to view)
Superintendent |
Milt Spanton |
Division or Location: |
DM&IR Missabe Division |
Interchange Railroads: |
Great Northern and Duluth, Winnipeg and Pacific |
Size of Railroad: |
60 x 24 - ~~1600 sq. ft. |
Scale: |
HO |
Era: |
Mid 1950s |
Control System: |
Digitrax with 100% radio throttles |
Scale Clock Speed: |
N/A |
Length of Session: |
3 hours |
Number of Crew: |
10 |
Train Control: |
Verbal |
Are Radios Required: |
No |
Listed Jobs: |
Dock Switch, Hill Ore, Proctor Yard Switch, Ore Extras, Mine locals, Cross Range, Hibbing and Virginia locals (freight), Passenger runs. |
Accessibility: |
Stairs |
Distance from hotel: |
36 miles |
Estimated travel time from hotel: |
39 minutes |
Web Site: |
{None...yet} |
Pets: |
2 cats |
Layout photos (click to enlarge):
Note: The
means that the link following will take you off the MINN-RAIL website. We have
no control over the content of these sites, but believe they will be of interest.
Send email to the
webmaster
with questions or comments about this web site.
Site originally designed by PJWebWorx.
Copyright © 2002, 2003, 2004, 2007 by MINN-RAIL.
|